Project Management

Zilker Park Trail
Scope of Work: Pedestrian Bridges, Concrete Sidewalks and Site Work
Read more.
One Texas Center
Scope of Work: Water quality ponds retrofitted into existing site
Read more.
Fayette Power Plant
Scope of work: Underground duct banks, piping, auger cast piles, drilled piers, foundations and pedestals
Read more.
Waller Creek
Scope of Work: Creek Bank Stabilization
Read more.
Tom Miller Dam
Scope of Work: Concrete Spillway Rehabilitation
Read more.
Perry Bass
Scope of Work: Jetty Improvements and water intake structure for the fish hatchery
Read more.
Prince Solms Park Gateway
Scope of Work: Sidewalk repair and replacement, site amenities, utilities, structural steel, tiered retaining wall and landscaping
Read more.
Schlather Park
Scope of Work: Drainage channel combined with a new city park
Read more.
Austin Community College Well House
Scope of Work: General Contractor. CMU block building with well monitoring equipment.
Read more.
Dos Rios Recycling Center
Scope of Work: New concrete junction box, engineer and install bypass system, demolition of existing pipe inside new junction box
Read more.
Beitel Creek Channel Restoration
Scope of Work: Remove 60,000 cubic yards of illegally dumped material from the creek bed, restore original creek channel flow,
Read more.
Cedar Creek Dam Improvements
Scope of Work: scour repair of the upstream side of the earthen dam. Strip damage areas of existing armoring, install
Read more.