General Contractor

Fayette Power Plant
Scope of work: Underground duct banks, piping, auger cast piles, drilled piers, foundations and pedestals
Read more.
Perry Bass
Scope of Work: Jetty Improvements and water intake structure for the fish hatchery
Read more.
Prince Solms Park Gateway
Scope of Work: Sidewalk repair and replacement, site amenities, utilities, structural steel, tiered retaining wall and landscaping
Read more.
Schlather Park
Scope of Work: Drainage channel combined with a new city park
Read more.
Austin Community College Well House
Scope of Work: General Contractor. CMU block building with well monitoring equipment.
Read more.
Dos Rios Recycling Center
Scope of Work: New concrete junction box, engineer and install bypass system, demolition of existing pipe inside new junction box
Read more.
Beitel Creek Channel Restoration
Scope of Work: Remove 60,000 cubic yards of illegally dumped material from the creek bed, restore original creek channel flow,
Read more.
Cedar Creek Dam Improvements
Scope of Work: scour repair of the upstream side of the earthen dam. Strip damage areas of existing armoring, install
Read more.
Brushy Creek Pedestrian Bridge
Scope of Work: Pedestrian bridge along with associated abutments, sidewalks, retaining walls, exercise stations and utilities.
Read more.
Goose Island Marsh Boardwalk
Scope of Work: New boardwalk pier and concrete work
Read more.
Mable Davis Skate Park
Scope of Work:site utilities, earth work, skate park complete with site amenities
Read more.
Medina River Greenway
Scope of Work: Site utilities, earthwork, site amenities, retaining walls, concrete trail and cement stabilized base trail system
Read more.