Excavation Contractor

Zilker Park Trail
Scope of Work: Pedestrian Bridges, Concrete Sidewalks and Site Work
Read more.
Fayette Power Plant
Scope of work: Underground duct banks, piping, auger cast piles, drilled piers, foundations and pedestals
Read more.
Waller Creek
Scope of Work: Creek Bank Stabilization
Read more.
Schlather Park
Scope of Work: Drainage channel combined with a new city park
Read more.
Austin Community College Well House
Scope of Work: General Contractor. CMU block building with well monitoring equipment.
Read more.
Dos Rios Recycling Center
Scope of Work: New concrete junction box, engineer and install bypass system, demolition of existing pipe inside new junction box
Read more.
Beitel Creek Channel Restoration
Scope of Work: Remove 60,000 cubic yards of illegally dumped material from the creek bed, restore original creek channel flow,
Read more.
Cedar Creek Dam Improvements
Scope of Work: scour repair of the upstream side of the earthen dam. Strip damage areas of existing armoring, install
Read more.
Brushy Creek Pedestrian Bridge
Scope of Work: Pedestrian bridge along with associated abutments, sidewalks, retaining walls, exercise stations and utilities.
Read more.
Loop 1604 Bridge Scour Repair
Scope of Work: Erosion Control, Rock Rip Rap, Gabion baskets
Read more.