Fayette Power Plant
Scope of work: Underground duct banks, piping, auger cast piles, drilled piers, foundations and pedestals
Scope of work: Underground duct banks, piping, auger cast piles, drilled piers, foundations and pedestals
Scope of Work: Sidewalk repair and replacement, site amenities, utilities, structural steel, tiered retaining wall and landscaping
Scope of Work: General Contractor. CMU block building with well monitoring equipment.
Scope of Work: New concrete junction box, engineer and install bypass system, demolition of existing pipe inside new junction box and install new automated diversion sluice gate.
Scope of Work: Remove 60,000 cubic yards of illegally dumped material from the creek bed, restore original creek channel flow, install erosion protection and landscape
Scope of Work: scour repair of the upstream side of the earthen dam. Strip damage areas of existing armoring, install geotextile fabric and install new riprap armoring.
Scope of Work: Pedestrian bridge along with associated abutments, sidewalks, retaining walls, exercise stations and utilities.
Scope of Work:site utilities, earth work, skate park complete with site amenities
Scope of Work: Site utilities, earthwork, site amenities, retaining walls, concrete trail and cement stabilized base trail system